A standard 1:2:4 concrete mix needs about 13 bags of 25 kg cement per cubic metre of finished concrete. A stronger 1:1.5:3 mix needs 16 bags, and a lean 1:3:6 mix needs 9.
The figure surprises people who expect it to scale simply with the ratio. The reason is that loose materials shrink when they’re mixed and compacted, so you need more dry material than the finished volume suggests.
Cement per cubic metre by mix ratio
| Mix ratio | Cement (kg) | 25 kg bags | 50 kg bags | 94 lb bags (US) |
|---|---|---|---|---|
| 1 : 1 : 2 | 554 | 23 | 12 | 13 |
| 1 : 1.5 : 3 | 403 | 17 | 9 | 10 |
| 1 : 2 : 3 | 370 | 15 | 8 | 9 |
| 1 : 2 : 4 | 317 | 13 | 7 | 8 |
| 1 : 3 : 6 | 222 | 9 | 5 | 6 |
| 1 : 4 : 8 | 170 | 7 | 4 | 4 |
All figures rounded up, because you can’t buy part bags and you always want a margin.
Where the 1.54 factor comes from
Sand and aggregate delivered loose contain a lot of air between the particles. When you mix them with cement and water, the fine material fills the voids in the coarse material and the whole lot compacts.
The standard allowance for this is a factor of 1.54: you need roughly 1.54 m³ of loose dry material to produce 1 m³ of compacted concrete. Some references use 1.52 or 1.57 depending on aggregate grading, but 1.54 is the working figure.
So for a 1:2:4 mix producing 1 m³:
- Total dry volume needed:
1 × 1.54 = 1.54 m³ - Total parts:
1 + 2 + 4 = 7 - Cement volume:
1.54 × (1 ÷ 7) = 0.22 m³ - Cement mass at 1,440 kg/m³:
0.22 × 1,440 = 317 kg - Bags at 25 kg:
317 ÷ 25 = 12.7, round to 13
The mix ratio calculator runs exactly this arithmetic for any volume, ratio and bag size, and also gives you the sand, aggregate and water figures.
Everything else you need alongside it
| Mix | Cement | Sand | Aggregate | Water |
|---|---|---|---|---|
| 1 : 1.5 : 3 | 403 kg | 0.42 m³ | 0.84 m³ | ~200 L |
| 1 : 2 : 4 | 317 kg | 0.44 m³ | 0.88 m³ | ~160 L |
| 1 : 3 : 6 | 222 kg | 0.46 m³ | 0.93 m³ | ~110 L |
Sand and aggregate are usually sold by weight rather than volume in the UK. As a rough conversion, sand runs about 1.6 tonnes per cubic metre and gravel about 1.5, so a 1:2:4 mix needs roughly 0.7 t of sand and 1.3 t of aggregate per cubic metre.
Cement quantities for common jobs
| Job | Volume | 25 kg bags at 1:2:4 |
|---|---|---|
| Fence post hole | 0.036 m³ | 1 |
| 8×6 ft shed base, 100mm | 0.43 m³ | 6 |
| 10×8 ft shed base, 100mm | 0.72 m³ | 10 |
| 3×4 m base, 100mm | 1.20 m³ | 16 |
| Single garage, 150mm | 2.70 m³ | 35 |
| 10 m strip footing, 600×600 | 3.60 m³ | 47 |
Buying cement
UK merchants sell cement in 25 kg bags almost universally now — 50 kg bags disappeared from general sale on manual-handling grounds. In the US the standard is a 94 lb bag, which is one cubic foot of cement by volume.
For anything over about 20 bags, ask about pallet pricing. A pallet is typically 40 to 56 bags and the per-bag saving is worth having. Just make sure you have somewhere dry to keep it — cement that’s absorbed moisture is a false economy, as covered in our guide to bag storage and shelf life.
Working backwards from bags you already have
Sometimes the question runs the other way: you have a certain number of cement bags and want to know how much concrete they will make.
| Cement (25 kg bags) | Concrete at 1:2:4 | Covers at 100mm |
|---|---|---|
| 1 bag | 0.08 m³ | 0.8 m² |
| 3 bags | 0.24 m³ | 2.4 m² |
| 6 bags | 0.47 m³ | 4.7 m² |
| 10 bags | 0.79 m³ | 7.9 m² |
| 13 bags | 1.03 m³ | 10.3 m² |
| 26 bags | 2.05 m³ | 20.5 m² |
A useful shortcut: one 25 kg bag of cement in a 1:2:4 mix makes roughly 0.08 m³ of concrete, which covers about three quarters of a square metre at 100mm thick. Handy for checking whether the pile of bags on the drive is going to be enough before you start mixing.
Cement content and strength
Cement is what binds concrete together, so more of it generally means stronger concrete — up to a point, and only if the water is controlled.
| Cement per m³ | Approx grade | Where it belongs |
|---|---|---|
| 170 kg | C10 | Mass fill, void filling |
| 220 kg | C15 | Blinding, kerb bedding |
| 300 kg | C20 | Slabs, footings, paths |
| 350 kg | C25 | Driveways, garage floors |
| 400 kg | C30 | Structural, heavy duty |
| 450 kg + | C35+ | Engineered, exposed |
Past about 450 kg per cubic metre you stop gaining much. The extra cement generates more heat as it hydrates and increases shrinkage, which can cause more cracking rather than less. Ready-mix plants hit higher grades by controlling the water-cement ratio and using admixtures, not just by loading in more cement.
Ordering the right amount
Cement is one of the few materials where buying slightly too much is clearly better than buying too little. A spare bag costs about £6 and keeps for months if stored properly. Running short mid-pour means either stopping with a cold joint through your slab, or a trip to the merchant while the mixed concrete goes off.
Two habits worth adopting. First, round up to the next whole bag and then add one more — on a 13-bag job, buy 14. Second, buy all the cement from the same batch where you can. Different production batches vary slightly in colour, which shows up on any surface that will be visible.
Sand and aggregate work differently. Both are sold in 850 kg bulk bags, and part bags are not a thing, so you round up to whole bags and accept some leftover. A 1 m³ pour needs 0.7 t of sand and 1.3 t of aggregate — one bulk bag of each covers the sand comfortably but leaves you short on stone, so you are buying two bags of aggregate and using two thirds of the second.
Why site mixes need more cement than ready-mix
A ready-mix plant will hit C20 with around 300 kg of cement per cubic metre. A 1:2:4 site mix uses 317 kg to reach the same grade, and in practice often delivers less.
The difference is control. A plant batches by weight, uses graded aggregate of known moisture content, mixes for a measured time, and adds admixtures to keep the water down. A site mix has none of that, so the ratios carry a built-in margin to cover the variability.
It’s worth knowing because it explains why site-mixed concrete of nominally the same grade tends to test lower than plant-batched. If strength genuinely matters, that margin is a reason to specify one grade higher than you think you need.
Worked example: a shed base
An 8 × 6 ft shed base at 100mm thick is 0.43 m³. Using 1:2:4:
- Cement:
0.43 × 317 = 136 kg, which is 6 bags at 25 kg - Sand:
0.43 × 0.44 = 0.19 m³, roughly 300 kg — one small bulk bag - Aggregate:
0.43 × 0.88 = 0.38 m³, roughly 570 kg - Water: about 69 litres
Buying sand and aggregate separately in those quantities is awkward, since bulk bags come in 850 kg. This is exactly the situation where all-in ballast makes sense: 1:6 with ballast means 6 bags of cement and one bulk bag of ballast, with a bit left over.
Common questions
How many bags of cement in 1m3 of concrete?
13 bags of 25 kg for a standard 1:2:4 mix. Richer mixes need more — 17 bags for 1:1.5:3, 23 bags for 1:1:2. Leaner mixes need fewer.
Why do I need 1.54m3 of material for 1m3 of concrete?
Because loose sand and aggregate contain air between the particles. Mixing and compacting fills those voids, reducing the total volume by about a third. The 1.54 factor accounts for it.
How much cement is in a cubic metre of ready-mix?
Around 300 to 350 kg for a C20 mix and 350 to 400 kg for C30. Ready-mix plants adjust cement content to hit a specified strength rather than following a fixed volumetric ratio.
Can I use less cement to save money?
You can, and the concrete will be proportionally weaker. Cement is roughly 20% of the material cost of a mix, so the saving is small against the strength you lose. Reducing cement is the wrong place to economise.
Does the cement type change the quantity?
Not the volume calculation. CEM I, CEM II and rapid-hardening cements all have similar bulk density, so the bag count stays the same. What changes is setting time and early strength gain.