What a Concrete Base Costs in the UK: Shed, Garage and Driveway

A concrete base costs £85 to £140 per square metre supply-and-lay in the UK, or £25 to £45 per square metre if you buy materials and do the work yourself. The base type changes both the thickness and the reinforcement, and both move the number.

Cost per square metre

Base type Thickness Materials only Supply and lay
Shed / garden building 100mm £25–£32/m² £85–£110/m²
Greenhouse 100mm £25–£32/m² £85–£110/m²
Garage 150mm + mesh £38–£48/m² £110–£140/m²
Driveway 125–150mm + mesh £35–£45/m² £100–£135/m²
Hot tub base 150mm + mesh £38–£48/m² £110–£145/m²
Workshop / heavy use 150–200mm + mesh £42–£58/m² £125–£165/m²

Shed bases: the common sizes

Shed size Base area Concrete at 100mm Materials Supply and lay
6 × 4 ft 1.8 × 1.2 m 0.22 m³ £70–£90 £220–£290
8 × 6 ft 2.4 × 1.8 m 0.43 m³ £120–£150 £380–£480
10 × 8 ft 3.0 × 2.4 m 0.72 m³ £190–£240 £620–£800
12 × 10 ft 3.6 × 3.0 m 1.08 m³ £280–£350 £920–£1,180
16 × 10 ft 4.8 × 3.0 m 1.44 m³ £370–£460 £1,220–£1,570

Notice how small these volumes are. Every one is around a cubic metre or less, which puts them firmly in bagged or volumetric territory rather than drum-mix delivery — where the part-load charge would dominate the bill.

Garage bases

A single garage base at 3m × 6m is 18m². At 150mm that’s 2.7m³ of concrete, plus A142 mesh and a properly compacted 150mm sub-base. Materials come to roughly £700 to £860; supply-and-lay is typically £2,000 to £2,500.

The step from 100mm to 150mm adds around 50% to the concrete cost, and it isn’t optional if a car is going on it. Point loads from wheels concentrate at the edges, which is where thin slabs crack first — thickening the perimeter is worth more than adding thickness across the middle.

What thickness you actually need

Thickness is the single biggest lever on cost, and the one most often got wrong in both directions. Over-specifying a shed base wastes money; under-specifying a garage base creates a slab that cracks within two winters.

Use Slab Sub-base Mesh?
Garden shed, foot traffic 100mm 100mm No
Large shed or workshop 100–125mm 100–150mm Optional
Greenhouse 100mm 100mm No
Car parking / driveway 125–150mm 150mm Yes, A142
Garage 150mm 150mm Yes, A142
Hot tub 150mm 150mm Yes, A193
Van or heavy plant 200mm 200mm Yes, A193

The sub-base column matters as much as the slab column. A 150mm slab on 50mm of loose hardcore will fail before a 100mm slab on 150mm of properly compacted Type 1. Compaction has to happen in layers of no more than 75mm — dumping 150mm in one go and running a plate over the top achieves very little below the surface.

The groundwork nobody quotes for

This is where estimates diverge, and where DIY budgets go wrong. A base on level lawn is straightforward. A base on a slope, on clay, or where there’s an old patio to break out is a different job entirely.

  • Excavation: £15–£30/m² by hand, less with a mini digger at £120–£180 a day
  • Muck away: £180–£280 per 8-yard skip — and clay fills a skip alarmingly fast
  • Hardcore: £35–£50 per bulk bag, roughly one bag per 2m² at 100mm depth
  • Compaction: plate hire £45–£70 a day, and it needs doing in layers
  • Formwork: £4–£8/m² in timber and pegs
  • DPM: £2–£4/m²
  • Mesh: £6–£10/m² including chairs

Worked example: a 3 × 4 m base

Item Cost
Excavation, DIY with hired digger £150
Skip for spoil £220
Hardcore, 6 bulk bags £260
Plate compactor, 1 day £55
Formwork timber £70
DPM £30
Concrete 1.26m³, volumetric £290
DIY total £1,075
Same job supply-and-lay £1,150–£1,550

That comparison catches people out. Once skip hire and plant are counted, DIY on a small base saves surprisingly little — often under £200 for two days of genuinely hard work. The fixed costs simply don’t scale down.

Where DIY genuinely pays

The saving grows with size. On a 6m × 6m base a contractor’s labour is a much larger share of the total, and doing your own groundwork can save £1,500 or more. The skip, the digger hire and the compactor are the same cost whether the base is 12m² or 36m².

A sensible middle path is to do the excavation and sub-base yourself, then pay a contractor to form, pour and finish. You take on the unskilled labour and keep the skilled, time-critical part in professional hands.

Size your base and work out the volume first with the slab calculator, then price it both ways before deciding.

What changes the quote most

Two bases of identical size can differ by £800 in price. Four things account for most of it.

Access. A base in a front garden the truck can reach is a different job from one at the bottom of a rear garden behind a 900mm gate. Barrowing a cubic metre through a house-side passage is roughly forty trips, and contractors price that honestly.

What’s already there. Level lawn is the cheap case. An old concrete base to break out adds breaker hire, labour and two or three extra skips — often £500 or more before anything new goes down.

Ground type. Clay is slow to dig, heavy to cart and needs a deeper sub-base because it holds water and moves seasonally. Sandy or gravelly ground digs fast and compacts well. Made ground with buried rubble is the one nobody can quote accurately until they’re in it.

Levels. A base on a slope needs cutting into the high side and building up on the low side, plus a deeper edge form. Anything more than about 200mm of fall across the base adds meaningfully to both time and materials.

When you’re comparing quotes, ask each contractor what they’ve assumed about disposal and sub-base depth. That’s usually where the difference lives, and the cheapest quote is often the one that has assumed the most optimistic ground conditions.

Common questions

How much does a 3x3m concrete base cost?

Around £280–£350 in materials at 100mm thick, or £800–£1,000 supply-and-lay. The concrete itself is only about 0.9m³ — the majority of the cost is groundwork and disposal.

Do I need building regs for a shed base?

Not for a base under a normal garden shed. A garage, an outbuilding with services, or anything over 30m² usually does need approval. Check with your local authority before you dig rather than after.

How thick should a garage base be?

150mm with A142 mesh, on 150mm of compacted hardcore. 100mm is fine for a shed but will crack under a car, particularly at the edges where the wheels sit and the load concentrates.

Can I lay a base on top of an existing patio?

Rarely a good idea. Old patios sit on bedding sand that won’t carry the load, and you can’t see what condition the sub-base underneath is in. Lift it, inspect the ground and build up properly — otherwise you’re pouring a good slab onto a bad foundation.

How long before I can build on a new base?

A light shed can go on after 3 to 4 days. A garage or anything heavy should wait 7 days minimum, and ideally the full 28 days for the concrete to reach design strength. Keep it damp for the first week whatever you’re building.